Painting Contractor
in Toronto
A paint job is 80% preparation and 20% paint — which is why cheap paint jobs fail within two years. FAIME painting crews prep, prime, and apply two premium finish coats on every project, interior or exterior, across the GTA.
Every Surface,
Properly Painted
Painting is one of the two trades FAIME Construction self-performs — our own crews, not a subcontracted crew booked for the week. We paint commercial and residential properties across the GTA: commercial ceiling spray painting from scissor lifts, storefront and retail repaints, corridors and common areas, whole-house interiors, and exterior repainting with colour matching. Every project gets full surface prep, surface-matched primer and two premium finish coats (Benjamin Moore, Sherwin-Williams or Dulux), backed by a two-year written workmanship warranty.15+ years of trade experience · 100+ GTA projects · WSIB Active · $2M CGL · Free site visits
From a single feature wall to a whole-house repaint or a full exterior, FAIME treats paint as a system — surface prep, primer, and premium finish coats — not a rushed afternoon with a roller. Need drywall work first? See our dedicated drywall page.
Interior Painting
Premium interior painting with proper prep, primer, and two finish coats minimum — walls, ceilings, and trim cut in by hand for clean lines.
- Full interior repaints
- Ceilings, walls & trim
- Accent walls & feature treatments
- Cabinet painting & refinishing
- Premium low-VOC paints available
- Colour consultation support
Exterior Painting
GTA weather punishes shortcuts. FAIME uses premium exterior products, proper prep, and applies in the right conditions — so the finish survives the freeze-thaw cycle.
- Full exterior painting
- Semi-gloss colour matching to existing surfaces
- Trim & fascia painting
- Foundation parging & paint
- Stucco recoat & texture repair
- Deck & fence staining
Pre-Sale & Rental Repaints
Whole-house repaints before listing and suite turnover painting for landlords and property managers — fast mobilization, photo-ready results.
- Pre-sale whole-house repaints
- Suite turnover painting
- Common-area & corridor programs
- Occupied-home protocols
- Typical mobilization in 1–2 weeks
- Photo-ready finish quality
The Details That
Finish a Room
Doors, window frames, casings, baseboards and mouldings are where a paint job looks finished or looks rushed. We prep, repair and paint them as part of the same job, and install new moulding when a room needs it. We paint and repair doors and windows; we don't supply or install new units.
Door & Window Painting
Interior and exterior doors and window frames, prepped, primed and finished in semi-gloss or satin, with clean lines and no paint on the glass.
- Interior doors, both sides
- Exterior doors, colour-matched
- Window frames & sills
- Dock, steel and service doors
- Railings & steel stairs
Crack Repair & Prep
Minor cracks on frames, surrounds, casings and trim are filled, sanded flush, primed and painted, so the repair disappears into the surface.
- Hairline & minor crack filling
- Frame & casing repair
- Caulking at joints
- Primer over every repair
Trim & Moulding
Crown, baseboard, base shoe, chair rail, panel moulding and casing, installed first, filled and caulked, then painted with the room.
- Crown & baseboard
- Chair rail & wainscoting
- Panel moulding & wall frames
- Door & window casing
On record: on an occupied commercial building in Vaughan we replaced the failed window caulking, then painted the doors, railings, steel stairs, dock doors and window trim with the rest of the envelope. See the Vaughan project →
Pick the Sheen.
Pick Any Colour.
Sheen is how much light the dried paint reflects. The more shine, the tougher and more washable the wall, and the more it shows every flaw in the drywall underneath. What most homes end up with: flat on the walls and ceilings through most of the house, eggshell in the bathrooms and kitchen, and semi-gloss on doors and trim. Here is how the five sheens compare.
Flat / Matte
Walls and ceilings through most of the house
Hides wall flaws best and gives the richest colour. Scrubbable mattes now wipe clean.
Eggshell
Bathrooms, kitchens, laundry rooms
Soft low lustre. Wipes clean and stands up to steam, still forgiving on flaws.
Satin
Kids' rooms, mudrooms, busy walls
Pearl-like sheen. A step tougher than eggshell, for walls that get scrubbed hard.
Semi-Gloss
Trim, doors, railings
Clearly shiny and hard. Scrubs clean, but shows every bump on a large wall.
Gloss
Front doors, statement trim
Mirror-like and very hard. Needs near-perfect prep, because it hides nothing.
Swatches are an illustration of how light sits on each sheen, not a real paint sample. Sheen names also vary between brands: one brand's eggshell can be close to another's satin. Read the full sheen guide, room by room →
Colour: choose from the full catalogues
We paint in any colour from the premium lines we buy: Benjamin Moore, Sherwin-Williams and Dulux. Browse their full catalogues below, note the colour name and code, and we take it from there. We can also match an existing colour already on your walls or trim.
One honest tip: a colour never looks the same on a screen or a small chip as it does on your wall, in your light. Test a sample on the actual wall, and look at it in the morning and in the evening before you commit.
From our own work: a faded cream commercial building in Vaughan, taken to a deep grey in two full coats of Benjamin Moore 1602. See the Vaughan project →
Painting That Works
Around Your Business
Commercial painting is a scheduling problem as much as a finishing problem. Retail units cannot close, tower corridors stay in use, and a ceiling repaint over an occupied floor has to be masked to the last sprinkler head. FAIME self-performs this work across storefronts, low-rise commercial, high-rise buildings and institutional properties — so the crew that quotes it is the crew that shows up.
Commercial Ceiling Painting
Airless spray with a back-roll where the substrate needs it, worked from scissor lifts, two coats throughout. Exposed deck, T-bar grid and drywall ceilings, with fixtures, sprinklers and ductwork masked before a drop of paint moves.
- Airless spray with back-roll
- Scissor-lift and elevated access
- Exposed deck, T-bar & drywall ceilings
- Fixture, sprinkler & duct masking
- Two-coat coverage, no thin passes
- After-hours & weekend scheduling
Storefront & Retail Repaints
Repainting a unit that cannot afford to close. Work is staged overnight or across quiet days, the site is left clean and sellable every morning, and colours are matched to the brand standard you already have.
- Storefront exteriors & signage bands
- Interior retail walls, bulkheads & ceilings
- Overnight and off-hours turnarounds
- Colour matched to brand standards
- Occupied-store dust and access protocols
- Entry doors, frames & surrounds
High-Rise, Institutional & Common Areas
Repeat programs for property managers, building owners and boards — including high-rise residential and commercial towers and institutional buildings. Phased so one wing or floor stays open while another is painted, with low-VOC product in occupied space and a written scope you can hand to an owner, a board or a facilities team.
- High-rise corridors, lobbies & amenity space
- Institutional and facility repainting programs
- Stairwells, service areas & parking structures
- Suite and unit turnover painting
- Phased scheduling around building operations
- Low-VOC products for occupied space
- Written scope and completion reporting
Exterior Repainting & Colour Matching
The advantage of a contractor that self-performs both trades: when exterior paint is failing because the substrate underneath it is failing, the same crew repairs the wall and repaints it. No finger-pointing between a stucco company and a painter.
- Full exterior repainting
- Colour-matched semi-gloss on trim, columns & fascia
- Stucco and EIFS recoating
- Parging and foundation coating
- Substrate repair before finish coats
- Applied inside product temperature windows
Commercial painting: our school, condo, rental-building and warehouse projects →
Paint Fails at the
Prep Stage.
When paint peels at 18 months, the failure happened weeks earlier — dirty surfaces, skipped primer, thin coats. FAIME's painting discipline exists so that never happens to your walls.
Prep Is Non-Negotiable
Washing, sanding, patching, and caulking before any paint goes on. Most of a great paint job happens before the can is opened.
Primer Matched to Surface
Drywall primer on new board, stain-blocking primer on water marks, bonding primer on glossy trim. Skipping primer is how paint peels.
Premium Paint Only
Benjamin Moore and Sherwin-Williams on every project — product that actually covers in two coats and holds its colour for years.
Checked Under Raking Light
The first coat dries fully and gets inspected under side-light for holidays and roller marks before the second coat goes on.
Masking & Protection
Floors, fixtures, tile, and cabinets are properly masked before painting begins. No spatter on your hardwood, no overspray on your new tile.
Hand-Cut Lines
Trim, ceilings, and corners cut in by hand — crisp, straight lines at every intersection instead of taped-and-prayed edges.
Exterior Colour Matching
When existing exterior surfaces need to match — columns, trim, fascia, stucco — FAIME applies colour-matched semi-gloss that blends seamlessly. No visible patchwork.
Our Painting
Process
Walkthrough & Colour Selection
Free site visit, written scope and quote. Colour consultation support if you want it — including samples on your actual walls under your actual lighting.
Protection & Masking
Floors covered, fixtures masked, furniture moved or wrapped. Exterior: landscaping, windows, and hardware protected before any prep starts.
Surface Preparation
Wash, sand, patch, and caulk. Loose or failing old paint is removed, not painted over. Glossy surfaces are scuffed for adhesion.
Priming
The correct primer for each surface, applied as a full coat — not spot-primed where it's convenient. Scuff-sand between primer and finish.
Two Finish Coats
First coat dries fully and is checked under raking light. Second coat delivers the depth of colour that separates professional from DIY.
Touch-Up & Walkthrough
Touch-ups completed, protection removed, hardware reinstalled, site cleaned. You walk every room with us before we call it done.
Painting Work
We Have Actually Done
Photographed jobs, not stock imagery. Each one has its own page with the sequence of work and the finished result.
Interior Painting — 100-Suite Supportive Housing Build, Kitchener
Phase 1 of Friendship Village, a seven-storey, 92,410 sq ft supportive housing building in downtown Kitchener. FAIME Construction Inc. did subcontracting to Colour of Painting on the interior painting, from the parking level to the top floor: 100 residential units to a single written colour schedule, the corridors serving them, stairwells and stair railings, amenity and common rooms, door frames, walls and ceilings, the parking garage, and identification coating on fire-protection and sprinkler piping.
Painted while drywall, mechanical, electrical, sprinkler, flooring and door crews held the same floors on a set release sequence — areas taken as they were released, finished work protected behind the crew, areas handed back clean. This is the largest painting programme documented on this site.
See the Kitchener supportive housing project →Exterior Repaint — Occupied Commercial Building, Vaughan
A faded cream commercial building taken to a deep grey in two full coats of Benjamin Moore 1602, after stucco and brick repairs, new sealant joints and window caulking, and a Venetian finish where the wall needed it. Roof metals, entry doors and railings, metal stairs and dock doors painted too. 7–10 working days, tenant open throughout.
See the Vaughan commercial repaint →Full Exterior House Painting — Etobicoke Bungalow, Red Brick to White
FAIME marked up the house's elevation drawings to show the homeowner the result before starting, then painted the red brick white and finished the windows, doors, railings, gutters, soffits and porch trim in a dark contrasting colour. A crew of four, one week, before-and-after photos on the project page.
See the Etobicoke house painting project →School Repainting — Doors, Gymnasium & Change Rooms, Dunnville
The interior repainting programme at Dunnville Secondary School, June to August 2024: every hollow-metal and wood door and frame sanded, cleaned, repaired and primed with a rust-inhibiting primer before two enamel finish coats, plus the gymnasium walls and ceilings and the locker and change rooms in washable, moisture-resistant coatings. Completed on schedule, within budget and with zero safety incidents.
See the Dunnville school project →New School — Complete Interior Painting, Innisfil
The full interior of St. André Bessette Catholic School, a new two-storey school, painted between June and August 2024: classrooms, corridors, offices, gymnasium, auditorium and service rooms. Drywall primer-sealer throughout, flat acrylic on walls and ceilings, semi-gloss enamel on doors, trim and high-traffic surfaces, and low-VOC products, phased classroom by classroom to the general contractor's milestones.
See the Innisfil school project →Condo Suites & Common Areas — Queensland Condos, Stratford
Interior painting of a new apartment building, February to September 2025: residential suites (walls, ceilings, baseboards, trim, doors and jambs), suite entrance and hollow-metal doors, common corridors, amenity rooms and mechanical rooms. Primers matched to each substrate, eggshell walls, flat ceilings and enamel on doors, worked to the general contractor's access windows and closed out with a full punch list.
See the Queensland Condos project →Six-Storey Rental Building — Oakley Ridge, Guelph
A complete painting package on a new rental building near the University of Guelph: 110 units including the ground-floor townhomes, decorative feature painting in the amenity spaces, a 6,000 sq ft daycare centre, stairwells and mechanical rooms, line striping for the 78-space underground garage, and exterior metalwork, railings and lintels. August 2025 to January 2026, on time, on budget, zero safety incidents.
See the Oakley Ridge project →Structural Steel Fireproofing — York Region Warehouse, Newmarket
Selected beams, columns and a 1,300 sq ft steel deck coated with Sherwin-Williams Firetex® FX5120 and FX5090 for 1-hour and 2-hour ratings, applied in multiple coats about eight hours apart with dry film thickness recorded throughout, while the warehouse stayed in operation. See our intumescent fireproofing service.
See the Newmarket warehouse project →Affordable Housing — KW Habilitation Inclusive Living Residence, Kitchener
Interior painting of a four-storey, 18-unit affordable housing building for people with developmental disabilities: suites including accessible layouts, corridors, stairwells and common areas, with every wall cut cleanly against the building's exposed nail-laminated timber ceilings. March to May 2026, on time, on budget, zero safety incidents.
See the KW Habilitation project →Commercial Envelope Repaint — Vaughan
An occupied commercial building with FAIME as general contractor: stucco, brick and caulking repairs, then two full coats of Benjamin Moore 1602 over the whole envelope in 7–10 working days while the tenant stayed open.
Queensland Condos — Stratford
Suites, corridors, amenity areas, suite-entry and hollow-metal doors on a Stratford condominium — up to seven painters, February to September 2025.
Exterior Stucco Refinishing
Grind back, mesh, tinted finish coat and fresh base caulking on a Scarborough exterior — the case where repainting alone would have failed and the wall itself needed rebuilding first.
The Painting Contractors
Who Hire Us
A large share of our painting volume is subcontract work for other painting and finishing contractors — which is the hardest audience to fool, because they know exactly what the work should look like. Most prefer not to be listed publicly. This one agreed to be named.
Colour of Painting Ltd.
Colour of Painting held the finishes contract on Phase 1 of Friendship Village, a seven-storey supportive housing building in downtown Kitchener. FAIME Construction Inc. did subcontracting to Colour of Painting on the interior painting — 100 residential units, corridors, stairwells and railings, amenity rooms, door frames, walls and ceilings, the parking garage, and identification coating on fire-protection and sprinkler piping.
Painting
Across the GTA
Local pages: Painting in Vaughan →
Frequently Asked
Questions
- What does interior painting cost? The ten things that set the price →
- Flat, eggshell, satin or semi-gloss: which finish for each room →
- How painters protect your floors and furniture →
- What is a Level 5 drywall finish, and when do your walls need one? →
- New paint looks patchy or bubbly? What went wrong →
- Painting kitchen cabinets: what a finish that lasts takes →
Paint It Once. Paint It Right.
Get a written painting estimate — a single feature wall, a whole-house repaint, or a full exterior.