EIFS & Stucco
Contractor, Toronto
Exterior Insulation and Finish Systems (EIFS) and traditional stucco that protect your home from the GTA's extreme weather while dramatically upgrading curb appeal. FAIME applies every system by the book — no moisture traps, no failed membranes, no callbacks.
Exterior Systems
Built to Last
FAIME Construction is a GTA specialist in EIFS and exterior systems — full EIFS and stucco installation and repair, colour and texture matching, parging and fascia repair. We restore and finish residential and commercial building envelopes across Toronto, Vaughan, Mississauga and Brampton, matching existing finishes seamlessly.15+ years of trade experience · 100+ GTA projects · WSIB Active · $2M CGL · Free site visits
Ontario's climate is hard on exterior claddings. Freeze-thaw cycles, driving rain, and UV exposure demand systems installed exactly right. FAIME's exterior crews have the training and experience to do that.
EIFS Systems
Exterior Insulation and Finish Systems — the most energy-efficient cladding available for residential applications. Applied in strict accordance with manufacturer specifications and OBC requirements.
- Drainage-type EIFS (OBC compliant)
- EPS board insulation adhesion & mechanical fastening
- Fiberglass mesh base coat
- Finish coat in any texture & colour
- Flashing & waterproofing integration
- Expansion joint installation
- Architectural reveals & banding
Parging & Traditional Stucco
Three-coat traditional stucco and foundation parging for homes that require authentic texture and proven performance. Applied over properly prepared substrates with the right mix ratios.
- Three-coat Portland cement stucco
- Foundation parging & re-parging
- Scratch, brown & finish coats
- Smooth, sand & dash finishes
- Stucco repair & patching
- Painted or pigmented finish coats
EIFS Repair & Remediation
Failed EIFS from improper original installation is common in GTA homes. FAIME diagnoses, removes, and correctly reinstalls failed sections — or remediates entire walls where moisture has compromised the assembly.
- Failed EIFS diagnosis & assessment
- Moisture testing & investigation
- Partial & full EIFS replacement
- Transition to cladding change
- Flashing correction
- OSB substrate repair
EIFS Done Wrong
Is Mold Waiting to Happen.
The GTA has thousands of homes with failed EIFS — installed by contractors who didn't understand drainage planes, flashing details, or expansion joint placement. FAIME has fixed enough of these to know exactly what not to do.
Drainage-Type Only
We install only drainage-type EIFS — the system required by the Ontario Building Code. Barrier-type EIFS (common in failed 1990s installations) traps moisture and destroys wall assemblies.
Flashing Done First
Window, door, and penetration flashings are installed and inspected before a single board goes up. Flashing failures are the #1 cause of EIFS moisture problems in the GTA.
Expansion Joint Expertise
EIFS cracks without properly spaced expansion joints. We locate and install joints per the manufacturer's spec — at floor lines, openings, and changes in substrate.
Full Manufacturer Training
Our applicators are trained on the specific EIFS products we install — not just generic stucco workers. Product performance depends on correct application.
Air Barrier Integration
We understand how EIFS integrates with the home's air barrier and building envelope — critical for OBC compliance and long-term energy performance.
GTA-Specific Knowledge
15+ years working in the GTA climate means we know what finishes hold up, what colours stay vibrant, and what details fail in Ontario winters.
EIFS Installation
Process
Wall Assembly Review
We review your sheathing type, air barrier, and window/door details before quoting. The EIFS system selection depends on what's behind it.
Flashing & Air Barrier
All windows, doors, and penetrations are properly flashed and integrated with the air/weather barrier before any insulation board is applied.
Insulation Board Application
EPS insulation board adhered and/or mechanically fastened per manufacturer requirements. Joints staggered, edges tight, no thermal bridges.
Base Coat & Mesh
Reinforcing mesh embedded in base coat at all areas. Double-mesh at corners, openings, and high-stress areas. Proper overlap at all joints.
Finish Coat Application
Finish coat applied in selected texture and colour. Consistent thickness and texture throughout — no patches, no blotching, no lap marks.
Caulking & Final Detailing
All joints caulked with compatible sealant. Expansion joints tooled and sealed. Final inspection against manufacturer quality checklist.
Inside an EIFS Wall
And What We Check in Each Layer
Exterior Insulation and Finish Systems (EIFS) fail from the inside out. Cracking, staining and peeling on the surface are usually symptoms of a layer underneath, so that is where a repair starts and where a new wall has to be right.
A typical drainage EIFS assembly, shown for explanation. The real layers depend on the system on your wall or in your specification. Traditional stucco and block walls are built differently, and we confirm what is there before we write the scope.
Tap a layer to see what it does
Substrate, air and water barrier, adhesive ribbons, insulation board, base coat with mesh, and finish coat. Each one has its own check before the next goes on, and each one fails in its own way.
EIFS & Exterior Work
We Have Actually Done
Five completed exterior envelope projects, photographed stage by stage. Each has its own page showing the substrate we found, the build-up we applied, and the finished wall.
Full Exterior EIFS Transformation — Rebuilt, Insulated & Finished
A whole-bungalow exterior taken back and rebuilt. Rotten and loose wood was cut out and replaced and extra supporting timber added before any insulation went on — the part of an EIFS job nobody sees and everybody pays for if it is skipped.
EPS insulation board was then fixed flat across every face, fastener heads spotted with base coat, fibreglass mesh embedded in a full base coat, and a long-life finish coat applied, followed by a full property clean-up.
See the Innisfil EIFS transformation →Exterior Stucco Refinishing — Scarborough
The failing coating ground off, a mesh-reinforced base coat levelled dead flat, a warm tinted finish troweled on, and clean caulk lines run along the base of the building.
Commercial Stucco Repair & Venetian Finish
Stucco and brick repairs, a Venetian finish, new Canamould quoins and two full coats over an occupied commercial building in Vaughan — FAIME as general contractor.
Exterior Foundation Refinishing
Dated stone veneer stripped off the foundation, cracks repaired and parged, a mesh-reinforced base coat applied, then a tinted stucco finish colour-matched to the brick above.
Sto Stucco System — Kingston Hotel
Stucco trade contractor on the new Comfort Inn & Suites in Kingston: the full system across the header sections of the upper façade, from the air barrier and EPS board to a Sto mesh base coat and acrylic finish.
EIFS & Exterior
Across the GTA
What We Build With
EIFS is a system, not a product. The insulation board, base coat, reinforcing mesh, primer and finish are engineered to work together, and mixing components across manufacturers is one of the more common causes of premature failure we are called in to fix. We install to the method the manufacturer publishes for the system being used, and we work to the system named in your architect's or property manager's specification.
EIFS & Stucco Systems
The EIFS and cementitious materials we buy and install are primarily Durabond and Sto — both long-established in the Ontario market. Where an architect or property manager specifies a different system, we build to that specification instead. Where nothing is specified, we recommend a system suited to the substrate, exposure and budget.
Coatings & Paint
On the painting we self-perform, we buy premium-line product from Sherwin-Williams, Benjamin Moore and Dulux, with primer matched to the substrate rather than whatever is on the truck. Exterior colour matching is done on site against the existing finish.
Sealants & Accessories
Joint sealant, backer rod, mesh, trims and drainage accessories are selected to be compatible with the system they are used in. Sealant is the shortest-lived component of any exterior assembly, so we specify it deliberately rather than treating it as a consumable.
A note on certifications. We install these systems to published manufacturer method, and our applicators are trained on the products we work with. We do not describe ourselves as an approved applicator or certified installer for any brand. If a project requires a manufacturer-certified applicator, tell us at tender stage and we will confirm exactly what we can and cannot carry before you rely on it.
Go Deeper on Exterior Systems
Reference guides we wrote for owners, property managers and general contractors trying to work out what is actually happening to a wall — and what it should cost — before anyone quotes a scope.
What Drives Exterior Cost
The eight factors that set an exterior quote, what can move a price mid-project, and six questions that make two contractor quotes genuinely comparable.
Read the guide →EIFS & Stucco Crack Repair
Six crack patterns, what causes each one, how serious it is, and the framework for deciding between localized repair, refinishing, and replacement.
Read the guide →Freeze–Thaw Damage in the GTA
Why Southern Ontario winters are harder on exterior walls than colder climates, the five places that fail first, and the seasonal window that determines whether a repair lasts.
Read the guide →Frequently Asked
Questions
Protect Your Home's Exterior.
Get a professional assessment and written estimate for your EIFS or stucco project. We serve the entire GTA.