General
Contracting
One point of contact from demolition to final paint touch-up. FAIME manages your entire renovation — trades, scheduling, material procurement, and quality control — so you don't have to chase anyone.
End-to-End Project
Management
FAIME Construction provides general contracting across the GTA — multi-trade coordination, commercial tenant improvements, suite programs and written scope packages. With licensed trades, WSIB coverage and $2M liability, we manage residential and commercial projects in Toronto, Vaughan, Mississauga and Brampton from site visit to final walkthrough.15+ years of trade experience · 100+ GTA projects · WSIB Active · $2M CGL · Free site visits
As your General Contractor, FAIME takes on the full responsibility of your project — every trade, every material, every timeline. We visit the site first, prepare a clear written proposal, meet with you to confirm every detail, then move. You get one number to call.
Residential Renovations
Full home renovations, basement finishes, and multi-room projects managed start to finish under a single contract, with our own crews self-performing the envelope and finishing scopes.
- Basement development & finishing
- Kitchen & bathroom finishes
- Multi-room renovations
- In-law suite builds
- Interior & exterior finishing programs
- Commercial tenant improvements
Schedule & Site Management
Every trade sequenced correctly, every material on site when needed. FAIME manages the daily rhythm of your project — from mobilization through final walkthrough — so nothing waits and nothing gets repeated.
- Trade sequencing & scheduling
- Material procurement & delivery coordination
- Daily site supervision
- Quality control at every stage
- Client communication & updates
Trade Coordination
Your project needs framers, electricians, plumbers, HVAC techs, drywallers, and tile setters — all sequenced correctly. FAIME coordinates the schedule so each trade shows up at the right time, every time.
- Electrical (licensed sub)
- Plumbing (licensed sub)
- HVAC coordination
- Insulation & drywall
- Tile, flooring & finishes
One Call.
One Accountable Team.
Most renovation nightmares start the same way: too many subs, no one in charge, trades blaming each other. FAIME as your GC eliminates that entirely.
Single Point of Accountability
You deal with one person, one contract, one phone number. If something isn't right, FAIME owns it — not a sub you've never met.
Written Contracts, Always
Every scope of work, every change order, every timeline is documented in writing before work begins. No verbal promises that disappear mid-project.
Transparent Budget Tracking
We provide itemized budgets and track spend against estimate. You know where your money is going at every stage — no mystery invoices at the end.
Qualified, Verified Trade Partners
Our electrical and plumbing subs are licensed, insured, and WSIB compliant. We don't use handymen for licensed work — ever.
Schedule That Actually Holds
We sequence trades correctly and build buffer into the schedule for inspections and material delays. We don't overpromise timelines to win the job.
Post-Project Warranty
Our workmanship is covered by a written warranty in your contract: 5 years on EIFS, stucco and parging, 2 years on painting and other work. Any deficiencies identified during or after handoff are addressed — no ghosting after the final invoice.
The FAIME
GC Process
A clear, proven process that keeps your project on time, on budget, and stress-free.
Discovery & Site Visit
We meet on site, walk the full scope, photograph existing conditions, and listen to your goals and budget. No obligation.
Detailed Written Proposal
You receive a full itemized proposal — scope, materials, labour, trade coordination, timeline, and payment schedule. All in writing.
Operations Fee & Pre-Construction
A 30% Operations Fee is collected to cover materials and crew mobilization. Site access confirmed, utility locates called in, and all prep work completed before day one.
Demo & Rough-In Phase
Demolition and rough-in coordination for mechanical, electrical, and plumbing — all sequenced to minimize downtime and maximize inspection readiness.
Finishing Phase
Drywall, tile, flooring, painting, moulding installation, and fixture installation. FAIME crews do the majority of this work in-house — no hand-off to strangers.
Final Walkthrough & Handoff
We walk every inch of the project with you before final payment. Any deficiencies are noted and resolved. You receive all warranty documentation.
Jobs We Ran
From Start to Finish
Projects where FAIME carried the whole job — the assessment, the sequencing, every trade operation on site, and the close-out. Photographed stage by stage, each with its own page.
Full Exterior Rebuild — Carpentry, Insulation, Base Coat & Finish
A whole-bungalow exterior rebuilt through four distinct trade operations in sequence: rotten and loose wood cut out and replaced with extra supporting timber added, EPS insulation board fixed flat across every face, fibreglass mesh embedded in a full base coat with fastener heads spotted, then a long-life finish coat and a full property clean-up.
Getting that order right is the job. Insulation over unsound framing, or a finish coat over a base that has not cured flat, fails within a few seasons no matter how good the last operation looks on the day.
See the Innisfil exterior rebuild →FAIME as General Contractor — Commercial Envelope, Vaughan
FAIME held the whole job on an occupied commercial building: protection and scaffolding, stucco and brick repairs, removals, sealants and caulking, Venetian finish and parging, Canamould quoins, and two full coats of paint. We coordinated the tenant and the other teams on site throughout.
See the Vaughan commercial project →Office Unit Converted to a Café — Café Luka, North York
FAIME held the contract directly with the owner and delivered the complete fit-out in approximately two months: the former office interior demolished, the kitchen relocated, the washroom renewed, drywall replaced and painted, the open ceiling spray-painted, and new lighting, plumbing fixtures, flooring and vinyl baseboards installed through FAIME's licensed trade partners. Completed on time, on budget and with zero safety incidents.
See the Café Luka fit-out →Foundation Refinishing — Strip, Repair, Rebuild, Finish
Stone veneer stripped back, cracks repaired and parged, a mesh-reinforced base coat run around the full perimeter, then a client-selected tinted finish, caulking and clean-up — four stages managed as one contract.
Stucco Refinishing — Scarborough
Protection down first, failing coating ground off, mesh-reinforced base coat levelled dead flat, tinted finish troweled on, clean caulk lines and site clean-up. A sequenced job where skipping any stage undoes the next.
Serving 4 Regions
Across Ontario
Frequently Asked
Questions
Let's Build It Right.
Tell us about your project and we'll put together a detailed, written estimate — no obligation, no pressure.