Drywall &
Level 5 Finishing
Drywall looks easy until the pot lights turn on. FAIME drywall crews hang, tape, and finish to the specified level — including true Level 5 skim coats — so your walls stay flat under any light, in any room.
From Bare Studs
to Paint-Ready
FAIME Construction provides dedicated drywall services across the GTA — boarding, taping, mudding and Level 3, 4 and 5 finishing, including true Level 5 skim coats, fire-rated and moisture-resistant assemblies, plus repairs and patches. Clean, flat results for residential and commercial walls and ceilings in Toronto, Vaughan and the GTA.15+ years of trade experience · 100+ GTA projects · WSIB Active · $2M CGL · Free site visits
Boarding, taping, mudding, sanding — every stage either sets up a flawless paint job or sabotages it. FAIME does each one to the specified finish level, with no shortcuts that show up later as ridges under your paint. Ready for colour? See our dedicated painting page.
Installation & Boarding
Drywall hung with the proper fastener pattern, correct board for each room, and perpendicular to framing — the foundation every good finish is built on.
- Standard drywall hanging
- Moisture-resistant (green board) & cement board
- Fire-rated drywall assemblies
- Curved walls & arches
- Coffered & tray ceiling drywall
- Bulkheads & soffits
Taping & Finishing
Paper tape embedded in the first coat, filler coat, finish coat — each fully dried and sanded. Finished to the level your paint and lighting actually demand.
- Three-coat taping system
- Level 3, 4 & 5 finishes
- Full Level 5 skim coats
- Crisp corners & reveals
- Sanding between every coat
- Raking-light quality checks
Repairs & Patches
From water-damage replacement to invisible patches, repairs are finished to blend with the surrounding wall — not just filled and forgotten.
- Water-damage board replacement
- Patches finished to match
- Ceiling repairs
- Texture repair & matching
- Pot-light & access openings
- Pre-paint skim coating
Flat Walls Are
No Accident.
Bad drywall finishing only shows up under raking light — after the crew is gone and the paint is on. FAIME checks every surface under side-lighting before we call it finished.
Right Sequencing
Board goes up only after framing inspection is passed, mechanical rough-ins are complete and inspected, and insulation and vapour barrier are in place.
Three Coats, Fully Dried
Tape coat, filler coat, finish coat — each dried completely before the next, with sanding between. Rushed compound is how ridges appear under flat paint.
True Level 5 Capability
Not every crew can deliver a full skim coat over entire surfaces. FAIME has the finishers who can — for semi-gloss paint, dramatic lighting, and premium rooms.
Raking-Light QC
Every finished surface is checked under harsh side-light — the same light that would expose flaws after your pot lights go in — before we hand off to paint.
The Right Board, Every Room
Moisture-resistant board in wet areas, cement board behind tile, fire-rated assemblies where code requires them. Board choice is a code and durability decision.
Dust Control
Sanding is the messiest stage of any renovation. Containment barriers, floor protection, and daily cleanup keep the rest of your home livable.
Seamless Handoff to Paint
When FAIME handles both trades, the painter knows exactly what finish level they're getting — and primer goes on a surface that's actually ready for it.
Our Drywall
Process
Site-Ready Check
Framing inspection passed, rough-ins complete and inspected, insulation and vapour barrier in place. Drywall that goes up too early gets torn down later.
Board Hang
Correct board type and thickness per room, proper fastener pattern, hung perpendicular to framing. Moisture-resistant and fire-rated product where required.
Tape Coat
Paper tape embedded in the first coat of compound on every joint and angle. Corner bead set straight and true.
Filler & Finish Coats
Filler coat applied and sanded, finish coat applied and sanded to the specified level — including full-surface skim for Level 5.
Inspect Under Raking Light
Every surface checked under harsh side-lighting and touched up before sign-off. This is the step most crews skip.
Prime-Ready Handoff
Dust removed, surfaces wiped, site cleaned. Walls handed off genuinely ready for primer — yours or ours.
Drywall
Across the GTA
Frequently Asked
Questions
Walls Ready for Any Light.
Get a written drywall estimate — new boarding, finishing, or repairs and patches.